The Genoa's Oil Terminal

The connection with Genoa's Oil Terminal is arranged with 3 stainless steel pipe lines.

The pier has one berth with the following features:

Berths West 3
Type of berth finger
Type of berth along side
Side (Starboard/Port) starboard
Max Draft 10,80 m
Max LOA No limitations (1 vessel)
Max Beam No Limit
Max Dwt No Limit
Loading line size 6"-8" size and 2 for 8"
Cargo Hoses' size 6"
Max rate of Loading 100-230 m³/hr
Rate of discharge 250-450 m³/hr
Pressure to be maintained at manifold 7 bar


Note:

The vessels must arrive with segregated ballast, and in case of loading, with cargo tanks in gas free conditions, ready for the visual inspection by a cargo surveyor.

If the vessel is equipped with a fully operating Inert Gas System, this must be used during discharging operations of low flash cargoes to inert cargo tanks.

The empty tanks with previous low flash cargoes and the tanks with low flash cargoes in transit must be in inert conditions at all time too.

If the vessel is not equipped with IGS, it is anyhow allowed to berth.

Vessel must be equipped with a lifting appliance (with a s.w.l. of 3 metric tons.)